McInerney Contractors were awarded the construction of this €8m swimming pool that was designed by S and P Architects in which we acted as temporary works designer directly to the main contractor.

The new deck-level facility which replaces the 34 year old pool at Fairgreen, Naas includes a learning area, a sauna/steam room, a fitness suite, an aerobic studio and village type changing room.

 
Services Included:

Temporary Works Design of roof and structural connections.

Condition Surveys of surrounding buildings including crack monitoring.

Temporary works proposals for civils works

Method statements for works

Description of Role:

Civil Structural Engineering Temporary works designer 

Total Capital Value:

€8m

Dates of Involvement:

2007-2008

Name and Contact of Project Referee:

Ken Boland

086 3886555

Design Team:

Niall Patterson - Senior Structural Engineer

Sean Murphy - Senior Project Engineer