Hayes Higgins Partnership provided Civil/Structural design and supervision services for this Design and Build project involving the construction of Abbott Laboratories Treatment Plant, Cootehill, County Cavan.

Hayes Higgins Partnership performs the lead engineering role in the preparation of the detailed design requirements and the management of the procurement process.

 

Name of Project: Abbott Laboratories Treatment Plant, Cavan

Means of Procurement: Design and Build

Client: Abbott Laboratories

 

Treatment Plant Characteristics are as follows:


Influent Quality / Quantity:

  • 25,000 Population Equivalent

  • (1,500 kg BOD5/day, 150 m3/hr)

Final Quality:

  • BOD5 = 5mg/l

  • TSS = 10 mg/l

  • Total N = 15 mg/l

  • PO-P4 = 1 mg/l

  •  

Innovation: 

Hayes Higgins Partnership performed the lead engineering role in the preparation of the detailed design requirements and the management of the procurement process.

Description of Role:

Civil Structural Engineering Services
Design & Supervision Services

Total Capital Value:

€1.5m

Dates of Involvement:

2003-2005

 
Design Team:

Civil/Structural: Hayes Higgins Partnership
Treatment Process: Design Treatment Systems Ltd